Schilda in Neuhengstett - or how useful suggestions are implemented pointless
After the Working Group on Transport Neuhengstett his extensive documentation that was created in summer 2008, on 2 April 2009 presented in the Ortschaftsrat meeting - where about 80 percent of all the suggestions made have been rejected (which it: "it remains as it is!"), Are now but initial actions identified:
- zigzag mark in the Schillerstraße ( no parking) to the junction with L179 (would not the opposite side of the road have been more appropriate?)
- zigzag Mühlweg before Sparkasse (actually it is only 5 meters too short, it can be parked almost on the corner still, the measure makes so much sense).
raised during the April meeting by the AK and the traffic situation in Mühlweg . This suggests a kind of continuous Kandel main road (similar to the low board control). Desired were Mühlweg stop lines in front of the Cross, Silcherstraße, Uhland, and Mörike Hölderlinstraße, also to better show the poorly recognizable junctions. The only holding the line was painted, is (not only) for the AK completely incomprehensible in the way of the cross Mühlweg out. Result, see photo.
that this can work better, the installed years ago marking the junction area as the Way of the Cross / Möttling road.
are supposedly tested all of the desired marking work in the city by Mr. Fink, Wurster, Hiller and the clerk's office to their proportionality. Too bad that no one was the AK-site traffic is to / is ...
we are anxiously whether the traffic harvest in 2010 the barrier for the mill Aufstellspur addition of L 179 can be opened once in time. This year saw the opening only after half the crop was already delivered (despite advance notice!) - But it is now open ...
desired, was also a call for the use of Aufstellspur in the community newsletter and the establishment of a warning sign. In addition there was the part of the Building Department Director Mr. Wurster following response:
"... your suggestion to set up a sign I will discuss with our clerk's office, however, we have little hope for. Erection of traffic signs can only cause approve the Road Construction Office and.
experience, this is a long administrative review, the one way traffic review
requires on-site. "
road sign? Road show? A normal sign at the gate on Althengstett district was required to note in Blättle to use this lane !
Thus, it was this year used in any single grain delivered them for a lot of money and only this one basic scale track were (as every year) dangerous situations. - especially at night -. conjured up by the additional diverting traffic (Blocking of the B 295 to Weil in town!), This was seen even more critical.
A completely positive result is to be mentioned at this point in particular: Fortunately, was supported by the community Althengstett the suggestion of the AK converted traffic Neuhengstett to make the sidewalk in the industrial street in Althengstett direction Edeka market for pedestrians at all usable by the Park markings were changed.
0 comments: